{"id":1155,"date":"2009-10-19T15:40:00","date_gmt":"2009-10-19T19:40:00","guid":{"rendered":"http:\/\/blogs.northcountrypublicradio.org\/inbox\/2009\/10\/19\/the-debacle-at-crown-point-bridge\/"},"modified":"2009-10-19T15:40:00","modified_gmt":"2009-10-19T19:40:00","slug":"the-debacle-at-crown-point-bridge","status":"publish","type":"post","link":"https:\/\/blogs.northcountrypublicradio.org\/inbox\/2009\/10\/19\/the-debacle-at-crown-point-bridge\/","title":{"rendered":"The debacle at Crown Point bridge"},"content":{"rendered":"<p>Locals are still reeling from NYS DOT&#8217;s decision to shut down the Crown Point bridge.  Lives up and down the Champlain Valley have been utterly disrupted.<\/p>\n<p>I&#8217;ve interviewed state officials about the bridge since 2007.  Again and again, they&#8217;ve assured me and the public that the bridge is safe and will provide essentially uninterrupted service.<\/p>\n<p>Those promises proved to be troublingly incorrect. <\/p>\n<p>Despite years of repeated inspections, core samples, and a small army of consultants, the DOT apparently missed a structural flaw so glaring that there is a significant risk of structural &#8220;failure&#8221; even without automobile traffic.<\/p>\n<p>Thousands of locals have been driving their families over the bridge every day, confident that they and their children were safe.<\/p>\n<p>Assemblywoman Teresa Sayward has asked for a complete explanation for how these problems were missed.<\/p>\n<p>I think the situation at Crown Point bridge warrants more scrutiny.<\/p>\n<p>The Assembly or some other independent body should convene a hearing to review how the situation there was handled &#8212; or mishandled.<\/p>\n<p>Here are the key questions in my reporter&#8217;s notebook:<\/p>\n<p>1.  How were safety concerns missed for so long, despite such intense scrutiny of the structure?<\/p>\n<p>2.  If the bridge was continuing to degrade rapidly, why wasn&#8217;t it stabilized sooner?<\/p>\n<p>3.  Were concerns raised earlier about the integrity and safety of the bridge within DOT? <\/p>\n<p>4.  Is it appropriate that DOT&#8217;s schedule for replacing or repairing the bridge calls for four years of preliminary work? <\/p>\n<p>State Senator Betty Little has suggested that a &#8220;major tragedy&#8221; was averted on Friday.  It&#8217;s still unclear whether the bridge &#8212; an important historic landmark &#8212; can be salvaged.<\/p>\n<p>The public deserves a thorough and independent explanation of how we reached this point.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Locals are still reeling from NYS DOT&#8217;s decision to shut down the Crown Point bridge. [&hellip;]<\/p>\n","protected":false},"author":12,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[1],"tags":[],"_links":{"self":[{"href":"https:\/\/blogs.northcountrypublicradio.org\/inbox\/wp-json\/wp\/v2\/posts\/1155"}],"collection":[{"href":"https:\/\/blogs.northcountrypublicradio.org\/inbox\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blogs.northcountrypublicradio.org\/inbox\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blogs.northcountrypublicradio.org\/inbox\/wp-json\/wp\/v2\/users\/12"}],"replies":[{"embeddable":true,"href":"https:\/\/blogs.northcountrypublicradio.org\/inbox\/wp-json\/wp\/v2\/comments?post=1155"}],"version-history":[{"count":0,"href":"https:\/\/blogs.northcountrypublicradio.org\/inbox\/wp-json\/wp\/v2\/posts\/1155\/revisions"}],"wp:attachment":[{"href":"https:\/\/blogs.northcountrypublicradio.org\/inbox\/wp-json\/wp\/v2\/media?parent=1155"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blogs.northcountrypublicradio.org\/inbox\/wp-json\/wp\/v2\/categories?post=1155"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blogs.northcountrypublicradio.org\/inbox\/wp-json\/wp\/v2\/tags?post=1155"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}