Gouverneur: “Equipment Shelter” day 1

As I mentioned (did I?) we’re also constructing a 6′ X 8′ building in which to house our transmitter and ancillary equipment at the new site in Gouverneur.  Since I didn’t know what sorts of weather we’d be facing when the time came to actually erect the building, I decided to pre-fab most of the construction in my garage.

So today we arrived at the site with 4 walls, one floor, roof rafters, tools, a generator and TWO black Ford Ranger pickups!

Thanks to TMT Construction (of Gouverneur) there were concrete piers at the site:

So we just laid out our 6″ x 6″ stringers:

Nailed on the pre-fab floor joist system:

Then the floor:

Then the wall sections:

I meant ALL the wall sections:

The the rafters:

Then we called it a day!